Two ways to work with us: ODM on a proven model from 300 pcs, or OEM on a design you own. The electronics, the tooling and the assembly stay under one roof, so a specification change is an engineering decision rather than a wait on someone else.
The trade-off is ownership and speed against investment and volume. Most brands start with ODM and move to OEM once the listing has proven itself.
Four capability areas that cover the full journey from concept to shipped carton.
PCB design and firmware development for LED drivers, RF generators, EMS pulse circuits, and battery management. We do not assemble imported modules.
CNC and injection mold development for custom housings, treatment heads, and packaging inserts. Mold development runs 45-60 days.
Clean assembly lines with 100% functional testing, battery safety checks, and firmware verification before packing.
CE, RoHS, FCC, and FDA documentation support, plus third-party optical and electrical test reports for your market filings.
An honest split is more useful than a claim that everything happens on site. This is where the line falls.
Eight steps from first contact to shipped goods.
No supplier asks a buyer to take the floor on faith. These are the three pages we send first, because they are the three things a serious buyer checks.
What we build in-house, what we buy in, and which stages sit between a bare board and a sealed retail carton.
See the facilityHow to get here, what a half-day audit covers, and how to book a slot that lands on a running production day.
Plan a visitThe wavelengths we run, how irradiance is measured, and why a 630nm claim without a test report is worth nothing.
Read the platformTell us what you want to build, your target market, and your volume. We reply within one business day with options, pricing, and a timeline.